Home » LED Light Panel Installation » LED panel light mounted installation -new
LED panel light mounted installation -new
A: Aluminum bar A, 2 PCS
B: Aluminum bar B, 2 PCS,
C: Long screws for install the frame to ceiling, 4 pcs.
D: Short screws for assemble the frame, 8 pcs.
Notice: The different between aluminum bar A and B is there are 2 screw holes at the end of Aluminum B.
Please see the picture below.
The 4 steps will be as follow:
Step 1. Assemble three bars to a un-finished frame.
Step 2. Install the un-finished frame to ceiling
Sept 3. Push LED panel into the unfinished frame.
Sept 4. Assemble the last bar and make the mounting frame finished.
Step 1. Assemble three bars to a un-finished frame.
Step 2. Install the un-finished frame to ceiling
Sept 3. Push LED panel into the unfinished frame.
Sept 4. Assemble the last bar and make the mounting frame finished.
Finished.
Please contact with our sales dept. to get more details.